Prices · complete · no quote needed
What does a skip cost?
In short: from CHF 369 for a 4 m³ skip (Welaki) in zone 1, including transport, disposal and 8.1% VAT. In full: the price is made up of the waste type, the container size and the distance — and all three factors are set out openly in the table below. We publish the complete price list because you should not have to phone anyone to find out what a skip costs.
What the price is made up of
- Disposal
- What it costs to recycle or dispose of the material properly. Depends on the waste type — clean excavated soil costs a fraction of what Eternit does.
- Transport
- Delivery and collection. Depends on the zone your address is in, and on whether it is a small or a large skip.
- VAT
- The statutory 8.1%. Already included in every price on this page — you see gross prices, not net prices.
Transport zones
The zone is based on the road distance between your delivery address and the nearest depot. When you order, it is worked out automatically from your postcode.
| Zone | Distance | Welaki 4/7 m³ & 5 m³ flat skip | Welaki 10 m³, 10 m³ flat skip & roll-off containers |
|---|---|---|---|
| Zone 1 | up to 6 km | CHF 153 | CHF 183 |
| Zone 2 | up to 11 km | CHF 183 | CHF 214 |
| Zone 3 | up to 18 km | CHF 203 | CHF 251 |
| Zone 4 | up to 24 km | CHF 214 | CHF 254 |
| Extended | beyond 24 km | Zone 4 + CHF 2.65 per km | |
Transport share, net · disposal and VAT come on top
Price table by waste type and size
All prices are gross amounts in zone 1, including transport, disposal and 8.1% VAT. In zones further away, only the transport share goes up — see the table above. A dash means that this waste type is not offered in that size.
| Waste type | 4 m³ | 7 m³ | 10 m³ | 20 m³ | 36 m³ | 5 m³ | 10 m³ |
|---|---|---|---|---|---|---|---|
| Mixed rubble | CHF 585 | CHF 869 | CHF 1193 | — | — | CHF 680 | CHF 1193 |
| Clean excavated soil | CHF 369 | CHF 491 | CHF 653 | — | — | CHF 410 | CHF 653 |
| Demolition concrete, class 1 | CHF 369 | CHF 491 | CHF 653 | — | — | CHF 410 | CHF 653 |
| Demolition concrete, class 2 | CHF 477 | CHF 680 | CHF 923 | — | — | CHF 545 | CHF 923 |
| Roof tiles and bricks | — | — | — | CHF 1734 | — | CHF 578 | CHF 990 |
| Inert materials | CHF 728 | CHF 1117 | CHF 1548 | — | — | CHF 857 | CHF 1548 |
| Mixed bulky waste | CHF 623 | CHF 935 | CHF 1287 | CHF 2410 | CHF 3993 | — | — |
| Green waste | CHF 494 | CHF 709 | CHF 965 | CHF 1869 | CHF 1779 | CHF 565 | CHF 965 |
| Waste wood A1–A3 | CHF 377 | CHF 504 | CHF 673 | CHF 1329 | CHF 3017 | — | — |
| Waste wood A4 | CHF 515 | CHF 746 | CHF 1017 | CHF 1936 | CHF 2831 | — | — |
| Combustible waste (incineration) | CHF 414 | CHF 568 | CHF 764 | CHF 1464 | CHF 2108 | — | — |
| Flat glass | CHF 511 | CHF 738 | CHF 1007 | CHF 1936 | — | CHF 587 | CHF 1007 |
| Eternit (fibre cement) | CHF 1342 | CHF 2193 | CHF 3085 | CHF 5247 | — | — | — |
Guide prices for zone 1 · binding price in the order form once you enter your postcode
Starting price per zone
The lowest price for each container size, depending on how far your address is from the nearest depot.
| Container | Zone 1 | Zone 2 | Zone 3 | Zone 4 |
|---|---|---|---|---|
| 4 m³ skip (Welaki) | from 369 | from 410 | from 437 | from 452 |
| 7 m³ skip (Welaki) | from 491 | from 531 | from 558 | from 573 |
| 10 m³ skip (Welaki) | from 653 | from 695 | from 745 | from 749 |
| 20 m³ roll-off container | from 1329 | from 1371 | from 1420 | from 1425 |
| 36 m³ roll-off container | from 1779 | from 1821 | from 1871 | from 1876 |
| 5 m³ flat skip | from 410 | from 450 | from 477 | from 492 |
| 10 m³ flat skip | from 653 | from 695 | from 745 | from 749 |
Questions about prices
How much does skip hire cost in Switzerland?
At Muldex, a skip starts at CHF 369 for a 4 m³ skip (Welaki) in zone 1, including transport, disposal and 8.1% VAT. The price depends on three things: the type of waste, the size of the container and the distance between the delivery address and the nearest depot. The full table is on this page.
Why does the same container cost more at one address than at another?
Because the transport share depends on the distance. We divide the journey into four zones: zone 1 up to 6 km, zone 2 up to 11 km, zone 3 up to 18 km, zone 4 up to 24 km. An address in zone 1 pays less for transport than the same order in zone 4. Beyond 24 km, a surcharge of CHF 2.65 is added for each additional kilometre.
How much does a skip for building rubble cost?
Building rubble is usually mixed rubble or inert material. A 7 m³ skip (Welaki) for mixed rubble costs CHF 869 in zone 1, all inclusive. For pure demolition concrete or clean excavated soil it is considerably cheaper, because disposal costs less — keeping each material separate pays off in the price.
Are there any hidden costs in the price?
No. The amount shown includes delivery, collection, proper disposal and VAT. Exactly two items can be added, and both are known in advance: the per-kilometre surcharge outside the standard zones, and the hire time if the skip stays longer than 14 days (CHF 5 per additional day).
How much does it cost if the skip stays longer?
The first 14 days are included in the price. After that, each additional day costs CHF 5. This is only charged at collection, for the days the skip actually stayed.
Is a skip or a roll-off container cheaper?
Per cubic metre, the large container is almost always cheaper. What matters, though, is whether you fill it: a half-full roll-off container costs more than two full Welaki skips. If you are unsure, choose the size you expect to fill to about 80% — for safety reasons, overfilled skips may not be transported.
How quickly is the skip delivered?
We usually deliver within 24–48 hours of your order. When you order, you choose the delivery date and the half-day (morning or afternoon).
What types of waste can I put in a skip?
We offer skips for building rubble, excavated soil, mixed rubble, concrete, roof tiles and bricks, inert materials, bulky waste, green waste, waste wood, flat glass, Eternit and combustible waste for incineration. Each skip takes one type of waste only, kept separate.
Are the prices all-inclusive?
Yes. The price shown includes transport (delivery and collection), disposal and the statutory VAT of 8.1%. No hidden costs.
Which cantons does Muldex deliver to?
We serve the whole of German-speaking Switzerland and French-speaking Switzerland (Romandie) — Geneva, Vaud, Fribourg, Neuchâtel and Jura included. In Valais, we deliver to the Chablais and the Martigny area from our depot in Bex. Ticino, Graubünden and Uri are not yet served.
How do I pay for my skip?
You can choose: pay straight away with TWINT, or by invoice, payable within 15 days once the job is complete. With TWINT, you receive all the payment details (with your order number as the payment reference) by email and on the confirmation page.
How long can the skip stay?
The first 14 days are included in the price. Each additional day is charged at CHF 5 per day — shown transparently and only billed at collection.
Do I need a permit for the skip?
Not on private ground — a driveway, courtyard or building site. As soon as the skip stands on public ground, that is on the road, the pavement or a public parking space, you need a permit from the municipality or the city police. The person placing the order obtains the permit; on request, we provide the skip’s dimensions and weight.
What happens if I don’t separate the waste properly?
Each skip is filled with a single material — one type of waste per skip. If foreign material is found when the load arrives at the disposal plant, the load has to be reclassified, which causes extra costs. If in doubt, just ask us before you fill the skip.
Prices for your town
Each town page shows the zone the town is actually in — and so the price that really applies there.